The new G1, G2 and 60

Phase 4 of the BusConnects Network redesign launches on 16 October 2022.
The network redesign is continuing to improve the existing bus network.
New routes G1, G2 and 60 will bring increased capacity, frequency and increased all day, night-time and weekend services., they also provide interchange with other modes of transport on the TFI network.
The G1, a 24-hour service will connect Red Cow Luas, Ballyfermot, City Centre and Spencer Dock.
The G2, also a 24-hour service will contact Liffey Valley Shopping Centre, Ballyfermot, City Centre and Spencer Dock.
And the Route 60 will connect Red Cow Luas to Sir John Rogerson's Quay, via Clondalkin, Cherry Orchard, Ballyfermot, Decies Road to Islandbridge and the city centre.
Route 60 will have two additional departures between Sir John Rogerson’s Quay and Cherry Orchard only:
- 08.40 from Cherry Orchard (Stop 7869) towards Sir John Rogerson’s Quay.
- 16.00 from Sir John Rogerson’s Quay towards Cherry Orchard.
These new routes coincide with the removal of Routes 79, 79a, and the western part of Route 40 between Liffey Valley Shopping Centre and the city centre. Route 13 and Route 40d will also benefit from revised timetables.
G1 Timetable
G2 Timetable
Route 60 Timetable
Phase 4 G Spine and Route 60 Booklet English
These changes have been coordinated as part of the TFI public transport network. For more information visit www.transportforireland.ie.